APC Rack PDU 2G, Metered by Outlet with Switching, ZeroU, 16A, 230V, (21) C13 & (3) C19

1 Review(s)
APC APC

New

APC Metered by Outlet with Switching Rack Power Distribution Units (PDUs) enable advanced, user-customizable power control and individual outlet power metering. Remote outlet level controls allow power on/off functionality for power recycling to reboot locked-up equipment and to avoid unauthorized use of individual outlets. Power sequencing delays allow users to define the order in which to power up or down attached equipment. Avoid circuit overload during power recovery and extend uptime of critical equipment by prioritizing the load shedding.


Call For Price And Availability

India: +91 895 697 6186
USA: +1 510 651 2205
Singapore: +65 9152 4003

[email protected]

APC Metered by Outlet with Switching Rack Power Distribution Units (PDUs) enable advanced, user-customizable power control and individual outlet power metering. Remote outlet level controls allow power on/off functionality for power recycling to reboot locked-up equipment and to avoid unauthorized use of individual outlets. Power sequencing delays allow users to define the order in which to power up or down attached equipment. Avoid circuit overload during power recovery and extend uptime of critical equipment by prioritizing the load shedding. Current metering provides real-time remote monitoring of connected loads. Switched Rack PDUs include real power monitoring, a temperature/humidity sensor port, and locking IEC receptacles. User-defined alarms warn of potential circuit overloads before critical IT failures occur. Users can access, configure, and control Switched rack PDUs through secure Web, SNMP, or Telnet Interfaces and is complimented by APC Centralized Management platforms using InfraStruxure Central, Capacity Manager and Change Manager.

Output                         
Nominal Output Voltage                                      
230V                                                                                                                                                         
Output Connections (21) IEC 320 C13          (3) IEC 320 C19
Overload Protection
No
Maximum Total Current Draw per Phase
16A
Input  
Nominal Input Voltage
200V, 208V, 230V
Input Frequency 50/60 Hz
Input Connections IEC 309 16 A 2P+E
Acceptable Input Voltage 100-240 VAC
Maximum Input Current per phase 10A
Cord length 3 Meters
Physical  
Net Weight
                                                 
6.77 KG
Maximum Height 1829.00 mm
Maximum Width 56.00 mm
Maximum Depth 51.00 mm
Shipping Weight 9.05 KG
Shipping Height 2038.00 mm
Shipping Width 162.00 mm
Shipping Depth 117.00 mm
Color Black
Environmental  
Operating Environment                                
-5 - 45 °C
Operating Relative Humidity 5 - 95%
Operating Elevation 0-3000 meters
Storage Temperature -25 - 65 °C
Storage Relative Humidity 5 - 95%
Storage Elevation 0-15000 meters
Conformance  
Regulatory Approvals
cUL Listed, FCC Part 15 Class A, ICES-003, PSE, UL 60950-1, UL Listed
Standard Warranty 2 years repair or replace    
Sustainable Offer Status  
RoHS
Compliant
REACH REACH: Contains No SVHCs
 Battery Directive  Compliant
 Battery Notes  Contains Lithium Coin Cell

  • CAN Port Terminator
  • Installation guide
  • Locking input power cord
  • Rack Mounting brackets
  • Safety guide
  • Serial configuration cable

Part Code:

AP8659EU3

Grade 
04/25/2015

PDU

Use For Data Center. Good Reseller

Write your review! !

Write a review

APC Rack PDU 2G, Metered by Outlet with Switching, ZeroU, 16A, 230V, (21) C13 & (3) C19

APC Rack PDU 2G, Metered by Outlet with Switching, ZeroU, 16A, 230V, (21) C13 & (3) C19

APC Metered by Outlet with Switching Rack Power Distribution Units (PDUs) enable advanced, user-customizable power control and individual outlet power metering. Remote outlet level controls allow power on/off functionality for power recycling to reboot locked-up equipment and to avoid unauthorized use of individual outlets. Power sequencing delays allow users to define the order in which to power up or down attached equipment. Avoid circuit overload during power recovery and extend uptime of critical equipment by prioritizing the load shedding.